Question
At which stage should the coordination of building and site systems be addressed to maximize the impact of integrative process?
A. Predesign
B. Detailed Design
C. Post Occupancy
D. Schematic Design
Answer
A. Predesign
Explanation
The coordination of building and site systems should be addressed at the predesign stage to maximize the impact of integrative process. The integrative process is a method of design and construction that involves the collaboration and coordination of all project stakeholders from the beginning to achieve the project’s sustainability goals.
The predesign stage is the earliest phase of the project, where the project vision, scope, budget, schedule, and performance targets are defined. By addressing the coordination of building and site systems at this stage, the project team can identify and analyze the interrelationships and synergies among various systems, such as energy, water, materials, indoor environmental quality, and site ecology.
This can help the team to optimize the design solutions, reduce costs and risks, enhance performance and quality, and avoid rework and conflicts later in the project.
To maximize the impact of the integrative process, the coordination of building and site systems should be addressed as early as possible, ideally in the predesign stage.
The predesign stage is the initial phase of a project, before the schematic design begins. It involves gathering information, setting goals, and defining the project scope and requirements. By considering the coordination of building and site systems at this early stage, the project team can take a holistic, integrated approach from the very beginning.
Addressing system coordination during predesign allows for:
- Early collaboration between architects, engineers, owners, and other stakeholders to optimize system integration.
- Setting sustainability and performance goals that inform system selection and design decisions.
- Identifying synergies and opportunities for systems to work together efficiently.
- Preventing costly redesigns or system incompatibilities that may arise if coordination is delayed.
- Maximizing LEED points in categories like Energy & Atmosphere and Sustainable Sites.
In contrast, waiting until later stages like schematic design or detailed design to coordinate systems misses out on the full potential of integration. While some coordination still occurs, key decisions may already be locked in, limiting optimization. And post occupancy is far too late to impact design.
Therefore, to fully leverage the integrative process and design the highest-performing building, coordination of building and site systems must start from the predesign stage. This early, proactive approach is critical for achieving LEED project goals.
The key points are:
- Predesign is the earliest stage where coordination can occur, before design begins
- Early coordination enables optimization, goal-setting, synergies, and avoiding issues
- It maximizes LEED points and building performance
- Later stages offer less flexibility and miss key opportunities
- Post occupancy is too late to impact the design
So in summary, option A, predesign, is the best stage to coordinate systems for maximum impact of the integrative process required by LEED.