Learn about retrocommissioning, the process of identifying and implementing system improvements to make existing buildings more suitable for their current use. Prepare for the LEED Green Associate exam with this comprehensive explanation.
Table of Contents
Question
What is the process that is performed on existing buildings to identify and recognize system improvements that make the building more suitable for current use?
A. Energy modeling
B. Retrocommissioning
C. Life-cycle assessment
D. Fundamental Commissioning (Cx)
Answer
B. Retrocommissioning
Explanation
Retrocommissioning is a process applied to existing buildings to ensure that they continue to perform optimally for the current use. This process involves checking systems to see if they function as intended, making necessary repairs or improvements, and ensuring that building staff are trained in the operation and maintenance of systems.
Retrocommissioning is the process performed on existing buildings to identify and recognize system improvements that make the building more suitable for current use. It involves a systematic evaluation of a building’s systems and equipment to ensure they are operating optimally and efficiently based on the building’s current requirements and usage patterns.
The key objectives of retrocommissioning are:
- Identifying operational improvements to enhance energy efficiency, occupant comfort, and indoor air quality
- Ensuring building systems are performing as intended and meeting current operational needs
- Reducing energy waste, operating costs, and environmental impact
- Extending the life of building systems and equipment
During retrocommissioning, a team of experts assesses the building’s HVAC, lighting, and control systems. They review operational data, conduct functional tests, and identify opportunities for improvement. Based on their findings, they recommend and implement targeted adjustments, repairs, or upgrades to optimize system performance.
The other options are related but distinct concepts:
- Energy modeling (A) involves simulating a building’s energy performance to predict consumption and identify efficiency opportunities, typically during design.
- Life-cycle assessment (C) evaluates the environmental impact of a product or process over its entire life cycle, from raw material extraction to end-of-life disposal.
- Fundamental Commissioning (D) is a process that verifies and documents that a new building’s systems are planned, designed, installed, tested, and capable of being operated and maintained according to the owner’s requirements.
In summary, retrocommissioning is the process focused on optimizing existing buildings for their current use by identifying and implementing targeted system improvements. It is an essential strategy for enhancing energy efficiency, occupant comfort, and operational performance in existing facilities.
USGBC LEED Green Associate certification exam practice question and answer (Q&A) dump with detail explanation and reference available free, helpful to pass the USGBC LEED Green Associate exam and earn USGBC LEED Green Associate certification.