USGBC LEED Green Associate: Overcoming Green Power Investment Barriers

Learn how on-site renewable energy power purchase agreements (PPAs) can help companies invest in green power while avoiding high upfront costs and maintenance expenses.

Table of Contents

Question

A company is considering investing in green power for its operations facilities, but is reluctant because of the high capital investment, maintenance costs and slow initial financial returns. Which of the following is a practical strategy to help the company overcome these obstacles?

A. Relocate the company to a region that is better suited for harnessing renewable energy
B. Divert the company’s research and development funds to investment in large scale hydroelectric power
C. Host an on-site renewable energy generation system and agree to buy the power without owning the equipment
D. Hire employees to staff a new operations department in preparation for the maintenance needs of the new renewable energy equipment

Answer

The most practical strategy for the company to overcome the obstacles of high capital investment, maintenance costs, and slow initial financial returns when investing in green power is:

C. Host an on-site renewable energy generation system and agree to buy the power without owning the equipment

Explanation

A charrette is an intensive, multi-disciplinary workshop with the aim of developing a design or vision for a project or planning activity. Charrettes are often conducted to design such things as parks and buildings, or to plan communities or transportation systems. A charrette should take place at the beginning of the project, when the design team can engage with all the stakeholders, including the client, users, consultants, contractors, regulators, and community members. A charrette at this stage can help to:

  • Establish clear goals and objectives for the project
  • Identify opportunities and constraints for the site and program
  • Generate creative and innovative ideas and solutions
  • Foster collaboration and consensus among diverse perspectives
  • Reduce conflicts and delays during later phases of the project
  • Enhance communication and trust among the project team

The other options are not appropriate phases for a charrette. Post commissioning is too late to influence the design or planning of the project. During the design process, some decisions may have already been made or some stakeholders may have been excluded. During the construction process, changes may be costly or impractical to implement.

This approach is known as a power purchase agreement (PPA). Under a PPA, a third-party developer installs, owns, and operates the renewable energy system (such as solar panels or wind turbines) on the company’s property. The company then agrees to purchase the electricity generated by the system at a fixed rate, typically lower than utility prices, for a set period of time (usually 15-25 years).

The key advantages of this strategy are:

  1. No upfront capital costs: The company does not need to make a large initial investment, as the developer bears the cost of installing the renewable energy system.
  2. Reduced maintenance responsibilities: The developer is responsible for maintaining and repairing the equipment, relieving the company of these ongoing expenses and operational burdens.
  3. Immediate cost savings: The company can start benefiting from lower electricity rates as soon as the system is operational, improving its bottom line and offsetting the slower financial returns typically associated with renewable energy investments.
  4. Reduced risk: By not owning the equipment, the company is protected from the risks of equipment failure, underperformance, or technological obsolescence.

In summary, hosting an on-site renewable energy system through a power purchase agreement is a practical and cost-effective way for companies to invest in green power while overcoming financial and operational barriers.